Mingenew is a primary site in the Shire of Mingenew, opened in 1937. Located on the Mingenew to Geraldton rail line, the site has 11 open bulk heads and three horizontal storage types for a total storage capacity of 480,200 tonnes, with four over road/rail bins for grain loading.